1. Long-distance (60-300M) transportation can be achieved through pipeline transportation, which can cross workshops
2. Conveying capacity: 5 tons/Hr
3. The longest conveying distance is 350m
4. Instant demand: Deliver within approximately 10 seconds from a distance of 300 meters, saving startup time
5. Can be transported to different receiving points (different vortex wells)
6. Save labor handling costs
7. The layout of the pipeline transportation workshop is convenient
8. Low maintenance cost (no maintenance for pipelines, regular maintenance for fans)



